Water-source heat pumps in multi-unit buildings are installed two main ways: vertically, in a wall or closet inside the space, or horizontally, above the ceiling. The maintenance scope is broadly the same. The visit is not.
In-wall and vertical-stack units
Access is through a closet or a panel inside the apartment or guest room. A technician can usually reach the filter, pan, coil and blower directly and complete the work standing on the floor.
The constraints are occupant-facing: notice, entry, protecting finishes, and leaving the space clean.
Ceiling-mounted units
Horizontal units above hard or tile ceilings need ladders or lifts, access-panel removal, drop cloths and often work over a corridor or bathroom. Clearances around the unit are frequently tighter than the manufacturer intended, and some buildings have units with no adequate access panel at all.
All of that is service time. A ceiling unit can take substantially longer than its in-wall equivalent, and the honest way to handle it is to account for it in the proposal instead of discovering it mid-program.
Access limitations belong in the report
When a unit cannot be fully serviced because access does not permit it, that should be documented explicitly. A building with twenty inaccessible heat pumps has a construction problem to solve, and it will only get solved if somebody writes it down.